Reduces HVAC Equipment Costs

By reducing HVAC equipment costs, VISIONWALL actually presents a FIRST COST CAPITAL SAVINGS when compared to conventional window systems.

Case Study- Lambert-St. Louis International Airport

As a result of reduced HVAC equipment, the Lambert-St. Louis International Airport was able to save over $350 000 in capital costs. 

 

Capital cost savings were realized in the following areas: 

  • Reduced HVAC multi-zone system size
  • Eelimination of hot water finned tube perimeter heating system in many areas due to VISIONWALL's high thermal efficiency
  • Rreduced chilled water distribution system for cooling due to VISIONWALL's improved shading coefficients.