![]() |
||
![]() |
Reduces HVAC Equipment Costs
By reducing HVAC equipment costs, VISIONWALL actually presents a FIRST COST CAPITAL SAVINGS when compared to conventional window systems. Case Study- Lambert-St. Louis International Airport As a result of reduced HVAC equipment, the Lambert-St. Louis International Airport was able to save over $350 000 in capital costs. |
|||
|
|
||||
|
|
Capital cost savings were realized in the following areas:
|